DeKalb County Sewer and Drain Service: Local Rules
Georgia Sewer cleans, inspects and repairs drains, sewer lines and water lines for homes in DeKalb County. Below: who to call first when sewage backs up, where your part of the line ends under the local provider's rules, and what we do about it.
Georgia Sewer — Drain & Sewer Specialists · Operated by Alpha Plumbing and Sewer, LLC
DeKalb County at a glance
- Area
- Unincorporated DeKalb County and Decatur, Doraville, Dunwoody, Ellenwood, Lithonia, Stone Mountain, Tucker
- Water and sewer
- DeKalb County Department of Watershed Management
Utility rules and numbers checked October 24, 2026
Whose pipe is it in DeKalb County?
The public sewer in DeKalb County is run by DeKalb County Department of Watershed Management. The provider answers for its main and its part of the line; the line on your side is the property owner's, and that is the part we work on. More on how the line is split: who is responsible for your sewer line.
DeKalb County Department of Watershed Management
Public sewer
If sewage is backing up or overflowing
- 24-hour emergency line(770) 270-6243
Where your part of the line ends
The owner maintains and repairs the sewer service connection on private property; the county maintains it within county street rights-of-way and sanitary sewer easements.
Source: DeKalb County Code § 25-220, read October 24, 2026“The property owner shall be responsible for maintenance and repair of building sewer service connections to the public sanitary sewer system on private property. DeKalb County shall be responsible for maintenance and repair of building sewer service connections within county street rights-of-way and sanitary sewer easements.”
On your side of that line? That part is the work we do. Call (404) 482-2527 or send a request.
Our services in DeKalb County
Each job starts with a diagnosis; the service follows what we find.
Local rules at a glance
Georgia Sewer works on the owner's side of sewer and water lines for homes on DeKalb County sewer. DeKalb County's Department of Watershed Management owns the public sewer in unincorporated DeKalb and in its cities, including Decatur, Brookhaven and Dunwoody. County code makes you responsible for the sewer connection on your property, while the county maintains the part in county street rights-of-way and sewer easements. Report a backup to the department's 24-hour emergency line or its online form.
About DeKalb County Department of Watershed Management
Georgia Sewer clears, inspects and repairs the private side of sewer and water lines for homes served by DeKalb County Watershed Management in Decatur, Dunwoody, Tucker, Brookhaven and unincorporated DeKalb. Call DWM for a problem in the county main or in the part of the connection in a county right-of-way or sewer easement; the building sewer on your property is the part we work on.
In the DeKalb cities and unincorporated communities on this page, the sewer under your street belongs to the county, not to your city. That means DeKalb's code and crews, not your city hall, decide where your part of the line ends and who clears a blockage near the street. Your city still issues the plumbing permit for work on your own pipes.
What follows comes from county and city sources we checked in October 2026.
Who provides sewer service here
The DeKalb County Department of Watershed Management (DWM) provides water and sewer service to more than 775,000 residents, maintains about 5,200 miles of water and sewer pipe, and treats wastewater at its Pole Bridge and Snapfinger plants. Decatur tells residents its water and sewer issues are handled by DeKalb County (City of Decatur). Brookhaven and Avondale Estates both say the county owns the sewer pipes and the service laterals under their streets, and that city crews have no authority to repair them (Brookhaven; Avondale Estates).
To confirm you are a DWM sewer customer, check your county water and sewer bill. DWM applies no sewer charges to customers who have septic tanks, so a bill without a sewer charge suggests your home is on septic (Services & Billing); the guide to telling septic from sewer lists other checks. The county's sewer work runs under a Clean Water Act consent decree with the U.S. EPA and Georgia EPD (Consent Decree).
Where your responsibility ends
DeKalb's code splits the connection at the edge of public space. The property owner maintains and repairs the building sewer connection on private property, and the county maintains and repairs it within county street rights-of-way and sanitary sewer easements (Code § 25-220). The county's sewer article also has its own definition of the building drain, which runs to a point 10 feet outside the inner face of the building before the building sewer begins (Code § 25-146).
In practice, the property-line cleanout marks the split. The county's sewer overflow response plan (October 2018 revision, posted with its consent decree documents) defines a private sewer line as the pipe from the property-line cleanout to the building, and says that if no property-line cleanout exists, the entire line from the building to the county main is treated as private (response plan).
The same plan covers the lower lateral, the stretch from the right-of-way cleanout to the main. If that pipe or its cleanout is 4 inches or smaller, the owner must bring it up to the county's 6-inch minimum. If there is no right-of-way cleanout or other access, the owner is told to have a plumber install one to code and stays responsible for clearing the private lateral; installing that cleanout is work we do. The plan's template notice to owners adds that when a backup into a building came from a blockage that originated in that building, between the property-line cleanout and the main, the owner pays the related repairs unless a defect turns up in a county-maintained line (response plan, sections 2.3.1.4 and 3.1.5).
Every building needs its own building sewer, with a narrow exception for a rear building on the same lot (Code § 25-212). For what cleanouts look like, see where to find your sewer cleanout; for how DeKalb compares with other Georgia providers, see who is responsible for your sewer line. DWM can tell you how the rules apply at your address, and an attorney can advise on any dispute.
If sewage backs up
DWM lists its hours as 24 hours a day, seven days a week (DWM), and its Services & Billing page lists a 24-hour emergency line and an email address for reporting sewer backups, water main breaks and outages (Services & Billing). For problems that can wait, the department has an online form for water and sewer repairs; Brookhaven, which recommends it, says DWM replies by email with a work order number you can use to track the repair (Brookhaven).
The 2018 response plan describes what happens next. A first-response crew decides whether the overflow comes from county pipes or private property and checks the nearby county main; only when a private spill is reaching streams or other waters of the state does the plan have the crew rod the service line from a cleanout to the main. If a county line is blocked, the county handles it. If nothing is wrong in the county system, the problem is classed as private, the owner is advised to have a plumber clear the private line (the work we do), and an owner without a property-line cleanout gets a letter about the code requirement. When a county maintenance problem in the lower lateral causes a building backup that needs professional cleaning, dispatch coordinates the county's contracted cleanup vendors (response plan, section 2.3).
When DWM classes the problem as private, call us to clear the line and run a camera through it. For what to do inside the house while you wait, see what to do when sewage backs up.
Repairs, permits and inspections
In unincorporated DeKalb, the county's Planning & Sustainability Department issues permits and inspects the work, and a plumbing permit must be submitted by a licensed plumbing contractor (permits page). The county's owner-occupant affidavit, which lets homeowners act as their own builder, says plumbing permits still require a state-licensed contractor (affidavit). Inspections are requested through the county's e-permitting portal (permits page).
Inside a city, the county says primary permitting is handled by the city's own permitting office, not the county (permits page). Decatur requires a separate trade permit for any sewer, drainage or plumbing work regardless of cost, plus a pre-application meeting with the city arborist if the work would disturb a protected tree's root zone (Decatur). Tucker lists sewer line replacement among jobs that need a plumbing permit (Tucker), and Brookhaven requires a permit for emergency work no later than 24 hours after it starts (Brookhaven). The table below links each city's office.
Work on the county's own pipes needs DWM's permission: no unauthorized person may uncover, connect to or disturb a public sanitary sewer without a written permit from the department (Code § 25-252). Whoever does the digging in DeKalb County, the first step is the same: a Georgia 811 request at least three business days ahead, which state law requires for mechanized excavation (Georgia 811; Georgia dig law). Under that law, DeKalb's help in locating a lateral ends at the edge of the public right-of-way. If the job needs a permit, we tell you before work starts.
Grease, wipes and rainwater
DWM's household grease advice: pour cooled fats, oils and grease into a sealed container for the trash, scrape plates and cookware before washing, and wipe greasy pans with a paper towel (Customer Outreach Programs). Its commercial program inspects restaurant grease interceptors (Commercial FOG Program), and its 2025 consent decree report says staff handed out grease education at apartment complexes and neighborhoods near sewer spills (2025 annual report). After an overflow from an apartment complex's private sewer line, county code can require the owner to get a grease permit, clean the lines with camera verification and educate residents (Code § 25-265.22).
County code bars connecting roof downspouts, exterior foundation drains, area drains or other surface runoff to a building drain or building sewer, and existing connections must be removed when the building sewer joins the public system (Code § 25-218). Rain is a real strain here: the county's 2025 report attributes 2024's jump in overflows to more heavy rain events and the inflow and infiltration they caused, and traces many wet-weather overflows to capacity limits in large trunk sewers (2025 annual report). For household habits, see what not to flush or pour and why drains back up when it rains.
Septic homes in this area
DeKalb Public Health's septic program must permit a new septic system, a new drain line or a repair before a contractor does the work, requires DPH-certified contractors for installing, repairing and pumping systems, and may hold a copy of your system's installation inspection report (DeKalb Public Health).
County code requires owners on a street with a public sewer to connect, at their own expense, within 24 months of official notice when the sewer is within 100 feet of the property line (Code § 25-154). Neighborhoods that want sewer have a cost-sharing route: five or more owners in the same drainage basin and within a quarter mile can ask DWM for a feasibility study, and if owners of at least 51 percent of the property in the designated area petition, the county can create a special tax district to build the line (Code § 25-187).
Cities and communities served
The table lists the places on this page that rely on DWM for public sewer, with each one's permit office. Other areas are in the local directory.
| City or community | Plumbing permits | Local note |
|---|---|---|
| Decatur | City of Decatur Design, Environment and Construction Division | City says DeKalb County handles its water and sewer issues; separate trade permits are required for any sewer, drainage or plumbing work regardless of value. |
| Brookhaven | City of Brookhaven Community Development | City says DeKalb Watershed owns the sewer lines and service laterals under its streets; city permits for emergency work are due within 24 hours after work starts. |
| Avondale Estates | City of Avondale Estates Planning & Permitting | City says DeKalb Watershed owns the water and sewer lines, including service laterals, under nearly every city street, and the city cannot repair them. |
| Chamblee | City of Chamblee Planning and Development Department | City code follows DeKalb County standards for new sewer construction; plumbing work is filed as a component permit through the city's online portal. |
| Clarkston | City of Clarkston Community Development | City says its water and sewer are managed by DeKalb County; plumbing repairs that alter piping need a city permit. |
| Pine Lake | City of Pine Lake | City public works coordinates with DeKalb Watershed, and building plan review can require a DeKalb Watershed capacity approval letter. |
| Doraville | City of Doraville Community Development | City says water service is set up directly with DeKalb Watershed, using the county's water and sewer service application; city permits require an owner affidavit. |
| Dunwoody | City of Dunwoody Community Development | City's trouble-call guide sends sewer spills to DeKalb's water and sewer emergency line; stand-alone plumbing repairs use a single trade component permit. |
| Tucker | City of Tucker Building and Permitting Division | City lists sewer line replacement among jobs needing a plumbing permit; its code has plats show easements for county-maintained sewer lines. |
| Stone Mountain | City of Stone Mountain Building Department | City directs water and sewer emergencies and questions to DeKalb Watershed Management; contact City Hall before starting work that needs trade permits. |
| Stonecrest | City of Stonecrest Building and Permitting Division | City says DeKalb owns and maintains sewer lines in public rights-of-way and dedicated easements, and homeowners maintain service lines on their property. |
| Lithonia | City of Lithonia Building and Permitting Division | City's utilities page names DeKalb County for all water service; confirm sewer service at your address with DeKalb Watershed. |
| Druid Hills | DeKalb County Planning & Sustainability Department | |
| North Druid Hills | DeKalb County Planning & Sustainability Department | |
| Gresham Park | DeKalb County Planning & Sustainability Department | |
| North Decatur | DeKalb County Planning & Sustainability Department | |
| Candler-McAfee | DeKalb County Planning & Sustainability Department | |
| Panthersville | DeKalb County Planning & Sustainability Department | |
| Scottdale | DeKalb County Planning & Sustainability Department | |
| Belvedere Park | DeKalb County Planning & Sustainability Department | |
| Redan | DeKalb County Planning & Sustainability Department |
Next step
Find your property-line cleanout now, before you need it. If you can't find one, ask DWM where your responsibility ends at your address, and ask us about adding a cleanout, since the county's response plan uses that cleanout to divide your pipe from the public one.
How we can help in DeKalb County
On the private side of the DWM split, our technicians handle main sewer line cleaning, hydro jetting for grease, sewer camera inspection to show which side a blockage is on, sewer line repair and replacement, and cleanout installation and repair, including the property-line cleanout DWM's response plan relies on. City pages: Decatur, Dunwoody, Tucker, Doraville, Stone Mountain and Lithonia. Call Georgia Sewer at (404) 482-2527 or request service.
Cities we serve on this system
Lead service line records in DeKalb County
Water utilities must keep a public record of what each service line is made of. What the categories and the utility's letter mean: lead service line check.
DeKalb County Department of Watershed Management
Water utility
Lead service line inventory: Address lookup
DeKalb reported no lead pipes in its inventory and has a "Check Your Line" map and a form to report your own line.
Look up your line The utility’s inventory page
Source: DeKalb County, read October 24, 2026Who owns the water line
DeKalb is responsible for the line from the main to the meter, the meter included; the owner for the line from the meter to the plumbing inside.
Source: DeKalb County, read October 24, 2026Sources (12)
- DeKalb County Department of Watershed Management: Watershed Management
- DeKalb County Department of Watershed Management: Services & Billing
- DeKalb County Code of Ordinances (Municode): Sec. 25-220. Maintenance and repair responsibility for building sewer service connections to public sanitary sewer system
- DeKalb County Code of Ordinances (Municode): Sec. 25-218. Connection of surface runoff and groundwater sources to public sewer
- DeKalb County Department of Watershed Management: Sanitary Sewer Overflow Contingency and Emergency Response Plan (October 2018)
- DeKalb County: Consent Decree Annual Report No. 14 (2025)
- DeKalb County Department of Watershed Management: Customer Outreach Programs
- DeKalb County Department of Planning & Sustainability: Permits, Plan Review & Inspections
- DeKalb Public Health: Septic Systems
- DeKalb County Code of Ordinances (Municode): Sec. 25-187. Submission of pre-petition request; submission of petition; creation of a special tax district
- City of Brookhaven: DMW Water & Sewer in Brookhaven
- City of Decatur: Public Works FAQs
Drain or sewer trouble in DeKalb County?
Tell us what the drains are doing, where and since when.
Call (404) 482-2527Or send a service request online
Operated by Alpha Plumbing and Sewer, LLC
Sewage coming out of a manhole or at the street?
Who to call first
DeKalb County Department of Watershed Management(770) 270-624324-hour emergency line
Drain or sewer trouble in DeKalb County?
Call and describe what is happening, where, and since when — the visit starts from there.
Georgia Sewer — Drain & Sewer Specialists · Operated by Alpha Plumbing and Sewer, LLC